ZE PAK S.A. WEBSITE

Current reports

Current reports

Current reports

Current report no. 13/2018

Information on the intention to implement an investment project at Konin Power Plant

 

Legal basis:

Art. 17 item 1 MAR – Inside information

 

Contents of the report:

Zespół Elektrowni Pątnów-Adamów-Konin SA („Company”) hereby informs about the directional consent of the Supervisory Board for the implementation of the investment consisting in the creation of a second biomass production unit at Konin Power Plant on the basis of an existing coal boiler and existing turbine sets.

 

The investment is to rebuild the K7 coal dust boiler for a fluidized biomass boiler.

 

The estimated power of the reconstructed unit is about 50 MW. As a result of the creation of the described biomass unit, the capacity of Konin Power Plant based on biomass will be about 100 MW. The expected completion date of the investment will be approximately 18 months, and the expected cost will be approximately PLN 100-130 million, depending on the scope of modernization works carried out.

 

At the same time, the Company stipulates that the implementation of the project requires obtaining the necessary administrative decisions and formal and legal consents as well as obtaining the desired financing structure for the project.

 

 

 

Signatures of persons representing the Company:

Adam Kłapszta – President of the Management Board

Zygmunt Artwik – Vice President of the Management Board

back